Go to Top

Why must sea sand be used in the construction of the seaport?

FAQ

2020/05/08
A limited amount of dredging will be undertaken alongside the plant site in order to allow large coal vessels to unload coal.  The dredged material is approximately equal to the material necessary for the reclamation thus optimizing the efficiency of the dredging and reclamation works.