Emission Control System
Emission Control System
Environmental Prevention and Monitoring Measures for Air Pollution
Production Process
►
Control annual average sulfur (S) content not to exceed 0.45 percent
►
Control nitrogen oxides (NOx) with Low NOx Burner technology
►
Dust collection using Electrostatic Precipitator (ESP)
►
Sulfur dioxide (SO2) removal using Seawater Flue Gas Desulfurization (SW-FGD)
Air Quality Monitoring — AQMS 4 Stations
►
SO2 (300 ppb)
►
NO2 (170 ppb)
►
TSP (330 µg/m3)
►
PM10 (120 µg/m3)
Stack Monitoring — CEMs 2 Production Units
►
SO2 (262 ppm)
►
NOx (241 ppm)
►
PM (50 mg/m3)
►
Opacity (20%)
Coal Yard
►
Water spray system at Stacker Reclaimer
►
Water spray system around coal yard, 45 points
►
Enclosed coal conveyor belt system
►
Wind fence, 6 meters high
►
Coal yard compaction by bulldozer
Coal Unloading Port
►
Water spray system at Ship Unloader Hopper
►
Enclosed coal conveyor belt system
Environmental Prevention and Monitoring Measures for Water Pollution
Cooling Water
►
Intake velocity controlled not to exceed 0.3 meters per second
►
Aquatic-life protection screens installed
Cooling Water Discharge Point
►
Cooling water discharge canal, 600 meters long
►
Aeration system
Wastewater Treatment from Production Process and Coal Yard — WPMS (WWTP & CYWWTP)
►
COD (120 mg/l)
►
pH (5.5-9.0)
WPMS 2 Production Units
►
COD (120 mg/l)
►
pH (5.5-9.0)
►
Temperature (40°C)
►
Cl (1 mg/l)
Environmental Prevention and Monitoring Measures for Industrial Waste
Bottom Ash and Fly Ash
►
Ready-mixed concrete
►
Road base materials
►
Concrete blocks and paving blocks
►
Plant pots / Hydro clay
Maintenance Waste
►
Blended fuel production
►
Recycling
►
Disposal by licensed contractors
ติดต่อเรา
ติดต่อเรา
พร้อมให้บริการ
สวัสดีครับ! ยินดีต้อนรับสู่โรงไฟฟ้า
บีแอลซีพี
มีอะไรให้ช่วยเหลือไหมครับ?
ตัวเลือกด่วน:
ติดต่อสอบถาม
เยี่ยมชมโรงไฟฟ้า
ข้อมูลบริษัท
แบบฟอร์มรับข้อร้องเรียน