The Coal Unloading Facility
is adjacent to the BLCP Power Station (does not extend into deep sea) and uses semi-closed-to closed mechanical belt conveyor and water sprays to prevent the spread of dust.

The Coal Stockpile
BLCP Power Station uses a wind fence, compaction of dead stock with grass covered, water sprays and a row of trees for wind and dust protection.

BLCP Power Station
BLCP Power Station generates 1,434 Megawatts of power using about 3.64 million tons of good quality of bituminuos coal per year and installed with Flue Gas Desulfurization (FGD), Electrostatic Precipitator (ESP) , Low NOx Burner, waste water treatment system and environment management equipment at a cost of over 14,000 million baht or 25% of total investment.